Lead Times:

Fast-Build Order is 4 Weeks: The date of this Order should not be considered the project start date. This date will be acknowledged in a Final Order Acknowledgment (F.O.A.). Manufacturing will not begin until F.O.A. is signed and returned to CW Woodcraft.

CW Builder Panels is 4 to 12 Weeks (depending on panel options): The date of this Order should not be considered the project start date. This date will be acknowledged in a Final Order Acknowledgment (F.O.A.). Manufacturing will not begin until F.O.A. is signed and returned to CW Woodcraft.

Ready-to-Ship Panel Orders is 1 to 2 Weeks: The date of this Order should not be considered the project start date. This date will be acknowledged in a Final Order Acknowledgment (F.O.A.). Packaging and scheduling of the shipment will not begin until F.O.A. is signed and returned to CW Woodcraft.

Accessory and Hardware Order is 1 - 2 days: In stock items will be pulled and shipped within 2 days, but there may be back-ordered items; the customer will be notified before shipping.

The Production Manager will determine a more accurate shipping and delivery estimate. Lead times listed above are not guaranteed, only standards, not considering any customization or submittal processes. If multiple shipments are required, lead time applies to first shipment.

Submittals, if required, add at least three weeks to lead time. Submittals include a finished sample piece and basic panel design layout. Other items required for approval before production may take additional time, which is to be determined. CW Woodcraft generally supplies basic shop drawings at no charge; however, they may require an initial deposit on the project to proceed with drafting them. The timely cooperation of the customer with information requests, drawing reviews, and revisions are much appreciated and will considerably reduce the submittal process time.

Shipping Terms: Delivered to Contiguous US. If shipping to Canada, shipped DDU (Includes only basic freight, there may be additional charges based on delivery address limitations, lift gate service, etc.)

Project Delays/Storage Fees: CW Woodcraft will add 5% for each subsequent 3-month project delay (including, but not limited to, delays in deposits). If the customer is not ready to receive the products within 30 days of completion, CW Woodcraft will add 5% per storage month's final price.